Description of Project

"NEI Resovoir and Pump Station"

Construction of a 2.4 million gallon, partially buried, pre-stressed concrete reservoir and a 6 million gallon per day booster pump station. The reservoir consists of a 130.5 foot diameter, wire-wrapped, pre-stressed concrete reservoir with concrete floor, cast in place concrete core wall, roof support columns and roof. The pump station facilities consist of four, 75 horsepower, horizontally mounted, split case, centrifugal pumps located in a 26 foot by 66 foot enclosed building. Work also includes installation of approx. 2,500 feet of 16 inch ductile iron transmission main.

 NEI Resovoir and Pump Station